Our Current Projects
Our project portfolio showcases the depth of our logistics expertise, demonstrating how we plan, manage and deliver complex operations with precision and consistency.
Bloomsbury Quarter P7
Value
£22.4 Million
Duration
14 Months
StructureTone appointed 4Site for a 14-month CAT A refurbishment of this Grade II listed building. The logistics requirements were complex due to the central location, tight access and heritage-sensitive environment.
We delivered on:
Uninterrupted programme flow on behalf of the main contractor – during demolition works, structural alterations and high-quality fit-out.
Flexible labour resource – including logistics managers, labourers, crane supervisors and slingers.
Delivery scheduling – pre-booked, coordinated and controlled deliveries from pitlane to workface.
Safe, efficient movement across a tight heritage site – with defined routes and marshalled access points.
Continuous coordination – real-time communication with the project team, local authorities and neighbouring stakeholders.
BREEAM excellent waste targets – structured waste streams with responsible disposal routes and ongoing monitoring.
Risk mitigation and compliance alongside our partner Encore – full adherence to CDM 2015, Environmental Protection Act and project-specific safety requirements.
Byron House
Value
Undisclosed
Duration
7 months.
Adderstone Nova appointed 4Site logistics to support them on their rooftop scheme in the West End. The logistics strategy was well thought out to cope with a fully occupied building and a restricted delivery access to site via the rear passageway.
We delivered on:
Uninterrupted programme flow on behalf of the main contractor – during demolition works, structural installations and high-quality fit-out.
Flexible labour resource – including logistics managers, labourers, hoist drivers, traffic marshals and slingers.
Safe, efficient movement from delivery to site - access via hoist and gantry.
Continuous coordination – real-time communication with the project team, local authorities and neighbouring stakeholders.
BREEAM excellent waste targets – structured waste streams with responsible disposal routes and ongoing monitoring.
Royal Exchange
Value
Undisclosed
Duration
2 Weeks
S4Site Logistics was appointed by Synergia Projects to deliver the full strip out of two floors at the Royal Exchange in Central London. Working within a live, high-profile city-centre environment, the programme was adapted to meet an accelerated two-week timeframe.
We delivered on:
Full floor strip out – removal of existing fixtures, fittings and finishes to provide a clear space ready for redevelopment.
Accelerated programme delivery – adapting our standard three-week programme to complete the works within two weeks, in line with the client’s requirements.
Flexible labour resource – providing the workforce required to maintain momentum and meet the compressed programme.
Efficient logistics coordination – managing the movement and removal of materials throughout the works to maintain a safe and productive operation.
Safe, controlled working environment – coordinating strip out activities within a busy Central London location, with a focus on safe access, movement and site operations.
Clear handover for the next phase – leaving the two floors stripped back and ready for the next stage of redevelopment.
The successful delivery of the project further strengthened our ongoing relationship with Synergia Projects and demonstrated the flexibility of 4Site Logistics’ growing strip out service.